Sunday, June 26, 2011

Waterfall

I have rebuilt the waterfall and installed the liner and pipe. waiting to buy the limestone "u" shape lip and the top.
More pictures later this week. It's a big week.... Waterfall should be close to done. Pond should be done dugged by Thursday. Did I mention had left over liner, so lastnight the hole grew wider. The piles of dirt should be gone and the new webcam conduit should be installed.

Here's what's left:
1) Waterfall
  a) u shape lip
  b) top
  c) liner nailed to bricks and trimed
2) pond
  a) pipes sealed
  b) finished digging
  c) trim liner
  d) install rest of rocks
3) flower/gardens
   a) install
   b) plant flowers and food
   c) in pond plants (lillies and cattails)
4) deck
   a) plan final design
   b) install conduits
   c) build deck/s
fill pond up with water.
put out chairs