Sunday, August 17, 2014

Gazebo update....

The cupola has been stained (8 coats inside and out), electrified and ready for the shingles and the weather vane.
The stain for the entire gazebo has been finalized.
The deck, ceiling and some of the trim will be "navajo red", everything else will be "sheer natural" (a cream color). These colors are the same colors of the lighthouse.

Phase 1 has started. All conduits are installed and the ground is being leveled. Also, the edging is being installed. The bucket represents whatever is going in the center of the "rock garden".