Saturday, June 25, 2016

6-25-16 Build Update

Today I installed the rest of the components to to "Skippy Filter" System and fired it up. All initial testing is working perfectly. Bought the stencil that goes on the middle waterfall panel, although haven't figured out what that panel will be made out of yet.

Wednesday, June 22, 2016

6-22-16: Tank installed & more siding

Today the tank with it's supports was installed. The right side- back support was installed. Siding was installed of both sides of the waterfall bump. The first 5 rows of siding was installed on the left side.
Lastly, the support for the right side catwalk was installed.