Project 2018: Waterfall Weir Test Fit and new Lake Trent servers
First test fit of the 3 ft stainless steel water weir. This week's plans, foam installation and rock work. Waterfall computer with auto-valves and controller comes this week from Utah. It will be running a flavor of Linux Fedora and will control the entire operation of the waterfall. It's main job is to reduce splash back and to keep the flow rate the same at all times. It will have many sensors, some are embeded into the weir during manufacturing so that it knows exactly how much water is being pumped to the falls and how much goes over. It will know the speed of the water going over to reduce splash back. It will be in 24/7 communications with Lake Trent's Weather station and will adjust due to wind speed, temperatures. It will also shut down due to high winds. It will be in communications with Lake Trent's filtration computer and life support computer. Lake Trent's Lighting System will also be on the new network and all 5 will be monitor by their new boss, server, "Krang" named after supervillain from Teenage Mutant Nija Turtles.
Sunday, December 10, 2017
Wednesday, December 6, 2017
Monday, November 27, 2017
Sunday, November 26, 2017
Friday, November 24, 2017
Sunday, November 5, 2017
Project 2018 begins... New Waterfall. (11/5/17)
Unfortunately, the waterfall area that sits in the center of the filter building, rotted over the past 2 summers. There was an issue with the old waterfall blade leaking water behind the blade. Today I tore out all the rotted material.
A new 24 or 36 inch waterfall blade with long nose will be installed and new frame will be made. Plans have not been made yet. Stay tune all winter for updates.