Wednesday, June 22, 2016

6-22-16: Tank installed & more siding

Today the tank with it's supports was installed. The right side- back support was installed. Siding was installed of both sides of the waterfall bump. The first 5 rows of siding was installed on the left side.
Lastly, the support for the right side catwalk was installed.










Monday, February 29, 2016

PHASE 1: Underground Pipe. COMPLETED

The underground pipe has been buried.
The pipe will contain the feed from the pond, the return back to the pond and the electric to the filter house.





PHASE 2 building of the filter house.