Monday, December 26, 2016

Sunday, July 24, 2016

Sunday, July 10, 2016

7-10-16 Update



Installation of the new lighting package is being installed.

UV filter is installed and running again.

Stainless steel has been ordered for the waterfall



Wednesday, June 29, 2016

Tuesday, June 28, 2016

Monday, June 27, 2016

Sunday, June 26, 2016

6-26-16 Back wall complete

The left back support was installed along with the back wall. "Skippy Filter" is working wonderfully!

Saturday, June 25, 2016

6-25-16 Build Update

Today I installed the rest of the components to to "Skippy Filter" System and fired it up. All initial testing is working perfectly. Bought the stencil that goes on the middle waterfall panel, although haven't figured out what that panel will be made out of yet.

Wednesday, June 22, 2016

6-22-16: Tank installed & more siding

Today the tank with it's supports was installed. The right side- back support was installed. Siding was installed of both sides of the waterfall bump. The first 5 rows of siding was installed on the left side.
Lastly, the support for the right side catwalk was installed.