7-10-16 Update
Installation of the new lighting package is being installed.
UV filter is installed and running again.
Stainless steel has been ordered for the waterfall
Wednesday, June 29, 2016
Tuesday, June 28, 2016
Monday, June 27, 2016
Sunday, June 26, 2016
6-26-16 Back wall complete
The left back support was installed along with the back wall. "Skippy Filter" is working wonderfully!
Saturday, June 25, 2016
6-25-16 Build Update
Today I installed the rest of the components to to "Skippy Filter" System and fired it up. All initial testing is working perfectly. Bought the stencil that goes on the middle waterfall panel, although haven't figured out what that panel will be made out of yet.
Wednesday, June 22, 2016
6-22-16: Tank installed & more siding
Today the tank with it's supports was installed. The right side- back support was installed. Siding was installed of both sides of the waterfall bump. The first 5 rows of siding was installed on the left side.
Lastly, the support for the right side catwalk was installed.
Lastly, the support for the right side catwalk was installed.
Tuesday, June 21, 2016
Monday, June 20, 2016
Sunday, June 19, 2016
Saturday, June 18, 2016
Friday, June 17, 2016
Subscribe to:
Posts (Atom)